Vacant land can require more utility coordination than an existing house because the connection point, transformer, meter location, temporary power and final building service may all need to be designed from scratch.
Check whether power is actually available at the property
A nearby distribution line does not automatically mean the final service connection is simple. Ask the utility for a formal service availability or new-service review.
Line extension and transformer scope
A rural or undeveloped site may require utility-side line extension, a transformer or other distribution work before a meter can be installed.
Temporary versus permanent power
Construction may need temporary service before the final house panel is ready. Treat temporary power as a separate project line item if it is required.
Plan the final meter and panel location
Locating the meter, service entrance and future main panel early can reduce redesign and avoid unnecessary conductor or trench length.
Use the electricity hookup calculator
Model the project with editable assumptions for utility fees, distance, line work, meter equipment, panel work, permits and contingency in the Electricity Hookup Cost Calculator.
Related pages
Frequently asked questions
How do I find out what electricity service will cost on vacant land?
Start with the serving utility. Request its new-service process, available connection point, required design information and any utility-side cost estimate.
Does a nearby power pole guarantee cheap service?
No. The serving voltage, available transformer capacity, route, easements and utility design can still affect the project.
Should I include a transformer allowance?
For early budgeting, a separate editable transformer or utility-equipment allowance can help model uncertainty until the utility provides a formal design.